Wednesday, March 28, 2007

Bathroom Tiling

The marble subway tile has been completely installed. It took the tile guy more than 2 weeks. The walls tiled to the 10 foot ceiling frames out the shower. This shower will have a total of 3 shower heads including a 12 inch rain shower head attached to the ceiling. The next step is to order the frameless glass shower door.

0 Comments:

Post a Comment

Links to this post:

Create a Link

<< Home