Roughing In The Plumbing
I've been out of town for more than 3 weeks and a lot has been done in my absence. The plumbers have just about finished roughing in the plumbing for the downstairs bathroom, kitchen and new on-demand hot water boiler. They are now extending the drain, gas and water pipes to the rest of the house (the top two floors.

0 Comments:
Post a Comment
Links to this post:
Create a Link
<< Home