Now that the foundation is in place the plumbers went to work this week putting in the cast iron sewage drains that needed to be installed before work on the concrete slab started (and the radiant heat floor for that matter). What you see in the picture is the drainage for the new bathroom on the ground floor. The pipe on the left is for the shower, the one in the middle for the sink and the one on the right is for the toilet. The pipes have been wrapped in polystyrene to protect the pipes during the concrete pour.