Tuesday, November 28, 2006

New Concrete Slab Is Poured

Yesterday the the concrete slab was poured while I was at work. I didn't get to see to floor getting poured (unfortunately) nor (even more interestingly) see the guys that were brought in to float the floor (i.e. get that super smooth and very level surface to the concrete floor). I was told it took about 6 hours in all. Today it was safe to walk on my new floor but it will take about 30 days in all to cure properly. My new foundation is now essentially done! Next step will be to work on the framing.